Skip to content

Review

Frontiers in Energy Research ·

Volume 14 - 2026 | https://doi.org/10.3389/fenrg.2026.1773305

The comparison analysis of ancillary service market in new power system: policies, practices and inspirations for China

  • Wen Chen1
  • Zhimin Wang1
  • Shuang Zhao1
  • Juan Liu1
  • Jiawei Zhang2*corresponding author
  • Xiaoyan Bian2
  1. 1Center of Power Grid Planning and Constructing, Yunnan Power Grid Co., Ltd., Kunming, China
  2. 2College of Electrical Engineering, Shanghai University of Electric Power, Shanghai, China
Article metrics0 viewsView details

Abstract

In the context of the accelerated access of renewable energy to the power system, how to effectively encourage multiple flexible resources to participate in system regulation has become the core issue of building a new power system. The ancillary service market is the key mechanism to solve this problem. This paper systematically reviews the policy evolution path and current practice of China’s ancillary service market, and selects representative mature markets such as Germany, PJM, and Australia for in-depth comparison. It is found that China’s market has laid a good foundation for the systematic and forward-looking top-level design, but there is still a gap with the international advanced level in terms of product design refinement, price signal sensitivity, subject participation breadth, and cross-regional resource coordination. In the future, from the three dimensions of technical support, market mechanism, and policy standards, this paper puts forward a series of specific suggestions, such as improving market design, strengthening incentive compatibility, and promoting standard unification, to provide a reference for the construction of an efficient and stable ancillary service market system in line with China’s national conditions.

Keywords

1 Introduction

By the end of 2024, the cumulative installed capacity of renewable energy in China’s power system reached 1889 GW, accounting for about 56.4% of total capacity (Xinhua 2025). Wind and solar power contributed 521 GW and 887 GW, respectively, representing 74.54% of renewable energy, indicating that China’s current renewable energy has been dominated by new energy. Since the ‘14th Five-Year Plan’, demand from emerging loads, such as data centers, new energy vehicle charging, and renewable energy hydrogen production, have developed rapidly (Wei et al., 2025). As a result, both the supply and demand in the power system, along with the regulation resources, have become highly uncertain. The balance mechanism of the power system is therefore shifting from deterministic generation tracking uncertain load toward two-way matching of uncertain generation and uncertain load (Bi et al., 2024). This shift makes it necessary to design reasonable allocation and optimal combination schemes for regulatory resources, improve dispatch capability, and support the construction of new power systems.

To maintain safe and stable power system operation and ensure the power quality, ancillary services have been introduced and refer to services such as peak shaving, frequency modulation, reserve, and ramping provided by the adjustable resources in addition to the normal power production, transmission, and consumption (National Development and Reform Commission, Energy Bureau 2024). To ensure these services are normally, properly, and officially operated, the ancillary service market has been proposed and refers to the market operation mechanism in which the business entities provide ancillary services through the market-oriented mechanism and obtain corresponding benefits based on market rules (Hirst and Kirby 1996). Reasonable formulation of ancillary service market trading varieties, a perfect market environment, business model, and reasonable call mechanism can effectively encourage diversified flexible resource investment, allocation, and cost recovery, fully release its potential, actively participate in and flexibly support system operation and scheduling, and ensure the adequacy of system regulation ability (National Development and Reform Commission, Energy Bureau 2024; Xu et al., 2022).

The research on the ancillary service market has been closely related to the system challenges brought by the high proportion of renewable energy integration. The literature review of this paper is as follows:

Most studies have demonstrated the necessity of introducing market-oriented mechanisms to stimulate flexible resources (Yang et al., 2023; Guo et al., 2020; Feng 2023; Yongsheng, 2023). However, the traditional planning compensation mode based on the generation side is difficult to fully stimulate the adjustment potential of each link of source, network, load, and storage, especially unable to adapt to the new situation of large-scale access of distributed resources (Eid et al., 2016), which becomes more prominent under the background of frequent extreme weather and deepening green transition (Xu et al., 2024). Therefore, it has been accepted to establish a market-oriented cost-sharing and return mechanism of ‘who provides, who profits; who benefits, who bears’ (Shu and Mays 2024).

After integrating this mechanism and practices, China’s market construction has entered the fast lane of ‘market-oriented exploration’ from ‘planned compensation’, and the pilot effects of ancillary services have begun to show (Asia and Dept 2023; Guo et al., 2020). However, the existing research on China’s ancillary service market focuses more on the development status, local pilot, and existing problems (Wu Shan et al., 2023; WANG Jiahao 2023; LI et al., 2019; Nan et al., 2025), and also points out that the market still faces challenges such as a relatively single variety structure, lagging price signal transmission (IEA 2023), incomplete inter-provincial barriers (Lin and Wetzel 2019; L. Huang 2023), and an imperfect cost recovery mechanism for emerging entities such as energy storage (Wang et al., 2025; Changxiang et al., 2022). For the frontier ancillary service varieties oriented to system stability (Oren 2001), such as inertial support (Poolla et al., 2020), fast frequency response (Fernández-Muñoz et al., 2020) and black startup (Pan et al., 2025), most of the domestic research is still in the stage of technical feasibility discussion and mechanism conception, lacking mature market design and in-depth analysis of practical cases (IEA 2024).

However, research on the international market mechanisms has been more in-depth. Scholars have conducted detailed analyses of the three-level balancing market based on the fine division of response time in Germany, the joint optimization and clearing of electric energy and ancillary services in the PJM market in the United States (Ott 2003), and the frequency control ancillary service (FCAS) mechanism independent of the energy market in Australia (Australian Energy Market Operator Ltd 2015; PW Consulting 2025). These studies focus on product design, pricing model, such as the ‘capacity + energy’ two-part system, and on friendly access rules for distributed resources, providing an important reference for China.

While existing studies have provided valuable case descriptions of individual markets, it is still insufficient to systematically compare the similarities and differences between Chinese and foreign markets, and closely combine the phased needs of China’s new power system construction to propose an operable hierarchical and phased development path (IEA 2024). This paper aims to address these gaps by extracting core experience and enlightenment for China’s market construction through multi-dimensional international comparison.

The main contributions of this paper are as follows: First, it constructs a theoretically grounded, multidimensional comparison framework: rather than offering purely descriptive comparisons, it analyzes market designs through the lens of incentive compatibility and mechanism design theory, explaining why certain mechanisms succeed or fail. Second, it provides a data-informed characterization of the performance gap between China and mature markets across key metrics, including capacity pricing, clearing mechanisms, and the participation depth of distributed resources. Third, it proposes a hierarchical, actionable development path tailored specifically to China’s staged conditions, distinct from generic policy recommendations, by incorporating phased targets for emerging ancillary services such as inertia, black start, and voltage support. The conclusions and prospects presented herein may serve as a reference for refining China’s ancillary service market. The framework of this paper is organized as Figure 1 shows.

Overall analytical framework of this paper, illustrating the flow from policy and practice review (China and mature international markets), through comparative analysis, to inspirations for China’s ancillary service market development.
Figure 1. Overall analytical framework of this paper, illustrating the flow from policy and practice review (China and mature international markets), through comparative analysis, to inspirations for China’s ancillary service market development.

2 A comparison analysis of policies and practices of the ancillary service market

In this paper, Germany, the U.S. PJM, and Australia’s National Electricity Markets (NEM) are selected as international comparison samples, primarily based on the following criteria: 1) Market maturity: All are benchmark markets operating for over 15 years with relatively well-established mechanisms; 2) Energy structure representativeness: Germany (with high-proportion renewable energy), PJM (a mix of conventional power sources and market mechanisms), and Australia (an independent grid with high-proportion distributed resources) cover different transition pathways; (3) Mechanism innovation: these markets pioneer areas such as balancing market design, joint clearing, and FCAS markets.

This study focuses on wholesale market mechanism comparisons rather than retail markets or technical implementation details. As markets such as Nord Pool and the UK also hold significant reference value, future research may expand the scope for a more comprehensive summary.

2.1 Policies and practices in China

At present, 16 provinces across the country have established a peaking market, 15 provinces have established a frequency modulation market, two provinces have established a ramping market, and six regions have established frequency modulation, reserve, peaking, and other markets (National Development and Reform Commission 2025), as shown in Table 1.

TABLE 1. Service type, function, dispatch mechanism, and provincial construction status of China’s ancillary service market, based on National Development and Reform Commission (2025) data.

CategoriesCore functionMechanism and practice highlightsConstruction situation
Peaking serviceTrack the peak and valley of the system load and the change of renewable energy output, and adjust the power generationThrough market-oriented revenue incentives, the average peaking depth of coal-fired power units has increased from 40% to 60%. In areas where the electricity market continues to operate, its functions will gradually be realized by the spot market.16 provinces across the country have established peak shaving markets
Frequency regulation serviceReduce system frequency deviation and provide active output adjustment service through automatic power control technologyMainly provides secondary frequency modulation; the cost is calculated according to the frequency modulation mileage, performance coefficient, and clearing price. Driven by the market, the grid frequency qualification rate will increase to 99.999% in 202415 provinces across the country have established FM markets
Backup serviceThe regulation capacity is reserved to adjust the active power output within the specified time when the system needsThrough the inter-provincial reserve market, regional mutual aid can be achieved. For example, the North China market has successfully responded to the 3 GW power gap caused by heavy rains. The cost is shared by the user’s electricity consumption and so onReserve and other markets have been established in six regions of the country
Ramping serviceDeal with the short-term large-scale changes in net load caused by renewable energy fluctuations and maintain system power balanceIt aims to solve the system operation problems caused by intermittent renewable energy power generation. There are differences in the definition and compensation standards of climbing services in different regionsTwo provinces across the country have established climbing markets
Others (i.e., inertia service, etc.)To maintain the stability of the system, but not included in the basic varieties of ‘basic rules of the ancillary service market’Some regions (such as North China and East China) have explored and compensated for the moment of inertia, but the definitions and standards are differentIt is in the stage of regional exploration and has not yet been unified in the national market.

2.1.1 Policies

The evolution of China’s ancillary service market is illustrated in Figure 2. Building on the market-oriented shift discussed above, competitive procurement now helps ensure the safe and stable operation of the power system (Feng et al., 2025) while promoting renewable energy consumption (Asia and Dept 2023). The key points of its mechanism design include (IEA 2023):

  • Clarify market players: the scope of business entities has expanded from traditional power generation enterprises to power sales enterprises, power users, and new business entities, and specifically clarified the legal status of energy storage enterprises, virtual power plants, smart microgrids, and V2G operating enterprises, aiming to guide diversified flexible resources to participate in system regulation (China Advances Power Market Reform to Support Renewable Integration and System Flexibility - Sino-German Cooperation on Climate Change 2025).
  • Improve the cost transmission mechanism: the core principle of ‘someone who provides profits, and someone who benefits bears’ is established. In the area where the power spot market operates continuously, the cost of ancillary services such as frequency modulation and reserve is shared by the user’s electricity consumption and part of the on-grid electricity, which ensures the reasonable transmission of costs.
  • Regulate market varieties and convergence: The Two Rules divide ancillary services into active power control, reactive power control, and accident disposal according to their functions, and standardize the definition of peak shaving, frequency modulation, backup, ramping, and other varieties. It is emphasized that the ancillary service market and the spot market of electric energy should be constructed in coordination. At the initial stage, they can be cleared independently, and when the conditions are mature, the joint clearing should be promoted to achieve overall optimization.
  • Establish a unified construction path: Aiming at the problem of large differences in rules across the country in the past, the rules have been designed to follow a scientific process from demand demonstration, simulation trial operation, to formal operation, aiming to promote the integration of decentralized provincial markets into the national ‘one game of chess’.
Schematic diagram of the evolution of China’s ancillary service market from a planned-compensation mechanism to a market-oriented mechanism, highlighting the four key design principles (market players, cost transmission, market varieties, and unified construction path). Source: Authors’ compilation based on National Development and Reform Commission, Energy Bureau (2024).
Figure 2. Schematic diagram of the evolution of China’s ancillary service market from a planned-compensation mechanism to a market-oriented mechanism, highlighting the four key design principles (market players, cost transmission, market varieties, and unified construction path). Source: Authors’ compilation based on National Development and Reform Commission, Energy Bureau (2024).

2.1.2 Practices

Under the framework of unified rules, diversified market practices have been carried out in various places. The main varieties and representative projects are concluded in Table 2. According to it, China’s ancillary service market practice has formed a diversified pattern based on frequency modulation, peak shaving, backup, and ramping services. Some other services are still under exploration, like the inertia service.

TABLE 2. Representative provincial practices of ancillary service markets in China, summarizing frequency modulation, peak shaving, and ramping service pilots by region.

CategoriesRepresent the practice project/regionInformation
Peaking serviceHunan Province: independent energy storage participates in frequency modulation
Chongqing City: power frequency modulation ancillary service market.
Frequency regulation serviceHunan Province: peak shaving ancillary service market.
Backup serviceNortheast China: Regional inter-provincial accident reserve capacity sharing mechanism
Shanxi Province: Backup ancillary service market.
Ramping serviceGuangdong Province: power climbing ancillary service market.
Others (i.e., inertia service, etc.)Exploring inertia auxiliary services in many places

In terms of the frequency regulation market, Hunan (Chao et al., 2021), Chongqing (National Energy Administration Central China Regulatory Bureau 2022), and other places promote the participation of new entities, such as independent energy storage, and pay according to performance, which effectively improves the regulation ability and grid frequency stability.

The peak shaving market (such as Hunan) stimulates the deep peak shaving of thermal power and the response of load-side resources through the market mechanism, which significantly promotes the consumption of new energy. To optimize the allocation of resources, innovative mechanisms such as inter-provincial mutual aid in Northeast China (National Energy Administration Northeast Regional Office 2025) and ‘semi-coupling’ clearing in Shanxi have emerged in reserve services (Zou et al., 2024). According to the latest policy effective October 2025, the price cap for peak-shaving ancillary services within the province shall not exceed the grid-connected electricity price of grid-parity renewable energy projects, i.e., 450 CNY/MWh.

Auxiliary ramping services, such as Guangdong Province (Jiantao Shi and Wen Zhao 2025), have entered a simulated trial operation to cope with short-term and violent fluctuations in new energy output. For new services such as inertia, the current compensation is mainly through the Two Rules in some regions. (Two Rules is a short abbreviation for official document issued by the National Energy Administration, i.e., South China Energy Regulatory Bureau, and launched a revised version of the Two Rules of Southern Region on Feb. 14th, 2025.).

In general, the construction of some relevant regional markets is in the research and exploration stage, all kinds of market practice projects are moving from pilot to deepening, and an ancillary service system covering multiple types of resources and multiple time scales is gradually constructed.

2.2 Policies and practices in other countries

2.2.1 Policies

In some mature electricity markets, represented by Germany (SMARD 2020), PJM in the United States (PJM Interconnection, 2025), Australia, and etc., the auxiliary service mechanism design, i.e., sometimes referred to as ‘balanced smarket’ in Europe, is more refined and highly coupled with the electricity energy market, as Figure 3 shows. Taking the German balancing market as an example, the outstanding features of its mechanism design include:

  • Fine product classification: German ancillary service products are strictly divided into three levels according to response time and function: primary frequency modulation reserve (Frequency Containment Reserve, FCR, second-level response), automatic frequency restoration reserve (aFRR, 5 min response), and manual frequency restoration reserve (mFRR, 15 min response). This classification enables accurate procurement of different performance resources.
  • ‘Capacity + Energy’ compound pricing model: In the German aFRR and mFRR market (Industry News 2025; Jomaux 2025), participants can not only obtain the fixed capacity income that provides reserve capacity through the capacity market bidding, but also obtain energy compensation when it is called. This model provides a stable and predictable revenue stream for flexible resources (especially resources with high investment costs) and reduces investment risks.
  • Friendly design of distributed resources: Germany’s balancing market rules do not require aFRR and mFRR providers to offer both upward and downward adjustment capabilities in equal measure. This rule greatly lowers the threshold for Virtual Power Plants (VPPs) to aggregate resources with only one-way regulation capability (such as load reduction and photovoltaic curtailment), promoting broader participation of distributed resources (Zdunkewicz, 2025).
  • Regional integration and cross-border synergy: Europe is promoting the establishment of a unified and balanced cross-border market (Huang et al., 2022). Germany has participated in the balanced resource cooperation project in Europe, realized the transnational procurement and unified call of balanced resources with neighboring countries (such as the Netherlands), optimized the allocation of flexible resources in a larger geographical scope, and improved the overall economy and security (Chen et al., 2019).
Basic institutional rules governing China’s ancillary service market, showing the classification of service varieties, participating entities, and settlement principles under the unified national framework.
Figure 3. Basic institutional rules governing China’s ancillary service market, showing the classification of service varieties, participating entities, and settlement principles under the unified national framework.

2.2.2 Practices

Foreign practice projects profoundly reflect their mechanism design concept. Several typical markets as examples to be illustrated are concluded in Table 3. It can be seen from the table that the foreign mature ancillary service markets present a high degree of differentiation and refinement:

  • PJM: Features product segmentation (frequency regulation divided into RegA/RegD signals) and multi-market joint optimization of energy, ancillary services, and capacity markets (Monitoring Analytics 2025). This co-optimization prevents strategic arbitrage between segmented markets, internalizes opportunity costs, and generates a unified price signal.
  • Australia (NEM): Operates a frequency control ancillary service (FCAS) market independent of the energy market, with performance-based payments ensuring reliability. In September 2025, battery storage revenue declined to AUD 85,000/MW, while over 6 GW of grid-forming storage capacity has been announced for delivery by 2027 to provide inertia and system strength services.
  • Germany: Employs a classic three-tier balancing market (FCR, aFRR, mFRR) with a “capacity + energy” compound pricing model to address underinvestment in high-capital-cost, low-marginal-cost flexible resources. Capacity payments cover fixed investment risk, while energy payments reflect real-time value. Its rules are VPP-friendly (Liu et al., 2025), and in 2025 Germany achieved a legislative breakthrough in inertia service procurement.
  • Nord Pool: Leverages a highly integrated regional grid to offer finely differentiated frequency products (milliseconds to minutes), providing high-yield opportunities for fast-responding resources like storage.

TABLE 3. Representative practices of ancillary service markets in Germany, PJM, and Australia’s NEM, summarizing product design, pricing structure, and participation rules.

American Pennsylvania-New Jersey-Maryland Interconnection (PJM) Market (Frequency Regulation Compensation in the Organized Wholesale Power Markets, 2011; Hogan and Pope 2019)
CategoriesCore functionMechanism and practice highlightsConstruction situationParticipants
Peaking serviceMaintain system frequency stabilityProduct segmentation: Divided into frequency regulation signal and load followingJoint optimization: Joint clearing with electric energy and the reserve market.Mature centralized market.Generator sets, energy storageetc.
Frequency regulation serviceMeet the intraday power supply and demand balanceIt is mainly realized through the price signal of the spot market of electric energy, and no independent ‘peak shaving’ varieties are set upThe mature spot market carries the functionAll resources are involved in the electricity market.
Backup serviceProvide fast reserve capacity to deal with sudden accidentsClassified procurement: Divided into synchronous backup (grid-connected) and non-synchronous backup (quick start)Joint clearing: Joint optimization with the electric energy and frequency modulation market.Mature market mechanismGenerator, energy storage, interruptible loadetc.
Ramping serviceDeal with the rapid change of net load caused by renewable energy fluctuationsAs the system operation demand is integrated into the market design, the climbing ability constraint of the unit will be considered in the spot market clearing modelAs an operational constraint, it is embedded in the market mechanismGenerators with fast adjustment capabilities, energy storageetc.
Others (i.e., inertia service, etc.)Maintain system stability, but did not establish a mature market.It is mainly provided by traditional units through grid-connected criteria. At present, not all regions have established a mature inertia market.It is in the exploratory stageTraditional synchronous generator set.
Australian National electricity market (NEM)
Peaking serviceProvide frequency control assistance service (FCAS) to cope with frequency deviationIndependent market: There is an independent FCAS market, which is parallel to the 5-min electricity spot market.Performance Payment: In 2025, the ‘frequency Performance Payment (FPP)’ reform will be implemented to reward units with excellent performance (such as battery energy storage) and punish units with poor performanceThe mature market is in a period of deep reformTraditional power plants, large energy storage power plants, and aggregators
Frequency regulation serviceBalance the supply and demand of the system and consume renewable energyCore mechanism: Through 5 min of spot market clearing, the peak electricity price encourages flexible resourcesMature ‘pure energy’ spot market.All power suppliers, large users, and retailers
Backup serviceAs a part of FCAS, it provides reserve capacity to deal with emergenciesThe backup service is an important part of the FCAS market, which is divided into multiple levels according to the response timeAs an FCAS subcategory mature operationLike FM service participants
Ramping serviceTo deal with the short-term shortage of system power caused by the photovoltaic ' duck curve'Price incentives: High electricity prices during peak hours stimulate fast-climbing resources such as gas turbines and energy storageProduct exploration: The introduction of more sophisticated, flexible products is discussed in the reformThe demand is significant, and the mechanism is still evolvingGas turbine, energy storage power station, fast start-stop unit, demand response
Others (i.e., inertia service, etc.)Maintain system stability and suppress the initial rate of change of frequencyMechanism exploration: Start to explore a market-oriented procurement mechanism that responds to inertia or fast frequencyChallenge: The withdrawal of coal-fired power leads to a decrease in system inertiaThe urgency is highlighted, and it is in the transition stage from mandatory requirements to market-oriented explorationSynchronous generator, energy storage with a fast frequency response function
Nord Pool market
Peaking serviceProvide multi-level frequency modulation services to maintain the frequency stability of the Nordic joint power gridFine product classification: From millisecond fast frequency reserve (FFR) to minute-level automatic frequency recovery reserve (aFRR), the division is extremely fineHigh price and opportunity: The high price of frequency modulation (especially FFR and FCR) provides the main source of income for fast resources such as energy storage, i.e., in Sweden and Finland, energy storage frequency modulation income accounts for up to 70%–90%Highly integrated and mature regional market.Hydropower units, energy storage power stations, and some thermal power units. Chinese energy storage enterprises are trying to enter the market.
Frequency regulation serviceRealize the intra-day balance of transnational power and electricityMainly through the day-ahead and real-time electricity market, the flexibility of regional hydropower and wind power is utilizedThe mature regional spot market carries out the functionAll power producers and power traders in northern Europe
Backup serviceProvide backup resources for frequency disturbances and power shortfallsIt mainly purchases frequency disturbance reserve (FCR) and manual reserve (mFRR), which are partly jointly cleared with the electricity market.Mature market mechanismGenerator sets, energy storageetc.
Ramping serviceDeal with a high proportion of wind power, hydropower output fluctuationsThe market design can naturally respond to the ramping demand for the system through the rapid clearing of the real-time market.The market mechanism naturally meets demandPower generation resources with flexible adjustment ability
Others (i.e., inertia service, etc.)Maintain system stabilityThe Nordic power grid has good inertia due to its high proportion of hydropower, which is currently mainly required by the grid-connected guidelinesNo special market has been establishedTraditional synchronous generator set.
Germany’s electricity market
Peaking serviceProvide complete frequency control, divided into primary (FCR), secondary (aFRR), and tertiary frequency modulation (mFRR)Capacity + energy market: FCR, aFRR, and mFRR all have capacity markets to provide participants with stable capacity gainsFriendly to virtual power plant (VPP): aFRR and mFRR allow resources not to have equal upper and lower adjustment capabilities at the same time, which greatly reduces the threshold for VPP to aggregate distributed resourcesIn mature markets, the mechanism is regarded as a model for VPP to participate in the market.Power plant, virtual power plant, energy storage, load aggregator
Frequency regulation serviceTo meet the short-term power balance of the system, it is mainly realized by the spot market.Through the European unified spot market (EPEX SPOT)The function is carried by the mature spot market.All electricity market participants
Backup serviceThe aFRR and mFRR are also important system backup resourcesComposite mode: aFRR and mFRR adopt the ‘capacity market + energy market’ modeCross-border procurement: Participate in European backup resources cooperation projectsMature market and participate in regional integrationPower plant, virtual power plant, energy storageetc.
Ramping serviceDerived from the system operation demand, the market mechanism stimulates the rapid adjustment of resourcesResources with fast climbing ability can realize value by participating in frequency modulation and the reserve market.As a derivative demand of other servicesFlexible power generation resources, energy storage
Others (i.e., inertia service, etc.)It provides ‘instantaneous reserve’ to suppress the sudden frequency change in extreme cases such as system splittingLegislative breakthrough: In April 2025, the German Federal Network Agency (BNetzA) decided to revoke the exemption, forcing transmission operators to conduct market-based procurement of ‘local network stability inertia’Fixed price procurement: The initial use of a pre-announced regional unified fixed price to stimulate investment in new technologiesEntering a new stage of market-oriented procurement: The procurement framework has been established, valid until the end of 2031, and is under implementationSynchronous motors, energy storage, and renewable energy converters with grid-building capabilities

These markets differ in their approaches to peak shaving, reserve (Hogan and Pope 2019), and ramping (Ott 2003), yet share common trends: increasingly refined product design, performance-based pricing, active integration of distributed and storage resources, and forward-looking exploration of emerging challenges such as system inertia decline (Nemes 2021). The following section synthesizes these findings into a structured comparative analysis.

2.2.3 Limitations and challenges

Despite their maturity, like features shown in Figure 4, these foreign markets also exhibit notable shortcomings that warrant critical attention rather than uncritical emulation. Germany’s fine-grained three-level balancing market has driven up transaction and compliance costs for smaller and distributed participants, and its aFRR/mFRR capacity prices have shown pronounced volatility as renewable penetration rises, complicating long-term investment planning for flexible resources (Jomaux 2025).

Comparative schematic of mechanism design features across mature international ancillary service markets (Germany, PJM, and Australia’s NEM), summarizing product classification, pricing models, and distributed resource access rules.
Figure 4. Comparative schematic of mechanism design features across mature international ancillary service markets (Germany, PJM, and Australia’s NEM), summarizing product classification, pricing models, and distributed resource access rules.

PJM’s co-optimized clearing of energy, ancillary service, and capacity markets, while efficient in theory, has faced criticism for insufficient market power mitigation and has produced sharp capacity price spikes. Its 2026/27 capacity auction cleared at $329/MW-day, well above historical averages—raising concerns about affordability and the adequacy of current market power safeguards (Monitoring Analytics 2025).

Australia’s FCAS market, despite its institutional separation from the energy market, has experienced significant revenue volatility for battery storage participants; NEM battery storage revenue fell to AUD 85,000/MW in September 2025, illustrating the risk that performance-based payment models can expose flexible resource investors to unpredictable returns. In addition, the high administrative complexity of maintaining separate FCAS products for multiple response timescales has raised entry barriers for smaller aggregators.

These experiences yield valuable lessons for China: fine-grained product differentiation should be pursued gradually to avoid excessive complexity in early-stage markets; robust market power mitigation mechanisms should be established before deep co-optimization is introduced; and price volatility risk-sharing tools should accompany performance-based payment designs to protect early-stage investors.

2.3 Comparison analysis

By combining the market policies and practices at home and abroad, the comparison of the following dimensions can be summarized in Table 4. China’s ancillary service market has taken a key step in the top-level design. The mechanism framework is systematic, inclusive, and forward-looking, and is committed to solving the systemic challenges brought by the high proportion of new energy access. Compared with the mature, fine, and international market system formed in foreign countries for decades, there are still gaps in the depth of rule implementation, the breadth of subject participation, the sensitivity of price signals, and the maturity of cross-border or regional resource allocation in China’s market.

TABLE 4. Comparative summary of ancillary service market design dimensions between China and mature international markets, covering services, pricing, clearing mechanisms, and participants.

Contrast dimensionChina’s ancillary service marketOther countries’ ancillary service markets
Development PathA critical transition from decentralized local pilot programs to a unified national regulatory framework. Initially reliant on administrative compensation mechanisms, and recent years have seen the gradual establishment of a market-based trading framework supported by policy systems such as the Two Detailed RulesKey tasks now focus on dismantling inter-provincial barriers, advancing regulatory harmonization, and achieving coordinated nationwide operations. The sector remains largely in the stage of mechanism development and institutional refinementA phase of mature operation and optimization. After years of refinement, market mechanisms now function with relative stability. The current focus lies in addressing challenges posed by high penetration of renewable energy, actively guiding participation from new entities like energy storage and virtual power plants, and deepening regional market coordination, such as the cross-border balancing market integration currently being promoted in Europe
Features of market Policies
Practices and Participants
Other Potential applicationsNew services such as inertia support are still in the regional exploration and compensation pilot phase. Currently, compensation is primarily implemented in certain areas like North China and East China based on the Two Detailed Rules, while a nationwide market mechanism has yet to be establishedInertia services have gradually transitioned toward market-based mechanism design. Additionally, other markets, like black startup, voltage control and reactive power, and distributed resource aggregation and VPP market, have also adopted similar applications

2.3.1 Development path

China’s power ancillary service market is evolving from basic coverage to refined design, currently in a stage of unification and standardization, transitioning from fragmented provincial pilots to national rules due to prominent regional discrepancies (China Energy Storage Alliance 2021). It has expanded from frequency modulation and peak shaving to inertia exploration (IEA 2024; Jenkins et al., 2022).

Mature international markets are now optimizing regional integration through two distinct models: PJM’s centralized, single-price co-optimization across a large multi-state footprint, and Europe’s federated model linking national balancing markets via common platforms while preserving national operators (Carrie 2024). China’s provincial structure more closely resembles the European arrangement. We therefore suggest that cross-provincial pilots draw primarily on the EU Balancing Guideline’s platform-based approach rather than PJM’s centralized clearing. North/East China is proposed as a pilot site due to its existing grid interconnection, comparable renewable penetration, and established inter-provincial coordination mechanisms, which lower institutional barriers. This is an initial siting rationale, not an optimality claim; further quantitative analysis is left for future research.

2.3.2 Features of market policies

  • Services: China’s market structure is clear, with established frameworks for frequency modulation (in 15 provinces), peak shaving (16 provinces), and ramping services (2 provinces). However, international markets demonstrate finer product granularity. For instance, Germany strictly segments frequency regulation into three tiers: FCR (30-s response), aFRR (5-min), and mFRR (15-min), enabling precise resource procurement.
  • Pricing and compensation: China employs a hybrid model. While some services retain compensatory traits, its market-oriented segments (e.g., frequency modulation) use a “mileage + performance” compound pricing. A common clearing price ceiling is 15 RMB/MW. Internationally, mature markets like PJM widely adopt a transparent “capacity price + energy price” model. For example, PJM’s 2026/27 capacity auction price reached $329/MW-day, strongly signalling system reliability value.
  • Clearing Mechanism: In China, independent clearing remains dominant, though pilots like Shanxi’s “semi-coupled” clearing for backup services point toward future integration. In contrast, international markets like PJM extensively use joint optimization (co-optimization) clearing across energy, ancillary service, and capacity markets. This mechanism is key to minimizing total social costs and efficiently allocating flexibility resources.

China’s current ancillary service product set insufficiently matches the multidimensional flexibility needs of renewable variability. We recommend adopting Germany’s response-time-based classification (aFRR/mFRR) as the primary near-term reference, because China’s province-level clearing structure resembles Germany’s zonal system rather than PJM’s centrally co-optimized market; this taxonomy can be implemented incrementally within each province without the deeper redesign that PJM’s signal-based differentiation would require. PJM’s finer product segmentation is better suited as a longer-term reference once provincial markets become more tightly integrated. We emphasize that this recommendation is limited to product taxonomy, which is settlement-structure-agnostic, and does not import pricing or settlement rules from either market, thereby avoiding potential inconsistencies from combining German zonal and PJM nodal designs.

2.3.3 Practices and participants

China’s ancillary service market encourages new entities like storage and VPPs through policy, yet their participation remains limited due to access thresholds, unclear business models, and complex settlement rules. Internationally, barriers are lower, with clear legal status, flexible aggregation rules (e.g., Germany’s one-way resource participation), and performance-based payments (e.g., Australia’s FCAS). We recommend pilot programs to clarify VPPs’ role as “third-party aggregators.” PJM’s settlement approach for aggregated storage offers a readily adaptable template, whereas designing an original domestic methodology would require several years of pilot data China currently lacks, making adaptation the lower-risk near-term option. Additionally, a UK-style public registration platform could reduce search and verification costs for small aggregators, and it operates upstream of settlement rules, so adopting both creates no inconsistency.

2.3.4 Other potential applications

In addition to mature and widely traded ancillary services above, such as frequency regulation, backup, and ramping, some leading foreign electricity markets have begun to explore and establish more forward-looking and targeted ancillary service markets in response to the new challenges brought by the high proportion of renewable energy integration. These markets mainly focus on the basic physical characteristics of system stability (such as inertia) and the recovery ability in extreme cases, which represent the frontier direction of the development of the ancillary service market.

  • Inertia and fast frequency response market

As renewable energy and inverter-connected storage replace traditional synchronous generators, system inertia continues to decline, posing challenges to frequency stability (Ulbig et al., 2014). Some markets have initiated commercial procurement of inertia or equivalent “virtual inertia” and “rapid frequency response” services. For instance, Australia’s National Electricity Market (NEM) has established regional minimum inertia requirements, permitting synchronous condensers and grid-forming energy storage to compete as resources providing inertia or millisecond-level rapid frequency response (“Inertia Requirements Methodology” 2024). Meanwhile, the UK’s National Grid has introduced new products like dynamic curtailment and rapid frequency response, mandating response times under 1 s, with battery storage emerging as the primary supplier (“National Energy System Operator” 2020; National Grid ESO 2023).

  • 2. Black start service market

Black start refers to the process by which the power system gradually restores power supply through internal self-starting units, without relying on the external power grid, after a major system-wide blackout (Friedlingstein et al., 2026). Mature international markets typically procure this as a specialized ancillary service. Grid operators regularly procure services from hydroelectric and gas-fired units with black start capability through tenders or bilateral contracts. Successful bidders receive fixed capacity fees and additional energy compensation when their services are activated. This mechanism is well-established in markets like PJM, the UK, Germany, ERCOT, and New Zealand (PJM Performance Compliance Department 2024; Black Start Strategy and Procurement Methodology 2021/22, 2021; ERCOT Grid Insights: Addressing Issues Important to Maintaining a Reliable and Resilient Grid 2025). It ensures reliable system restoration while avoiding massive investment in dedicated grid-owned resources.

  • 3. Voltage control and reactive power support market

While many markets still mandate reactive power services through technical standards or bilateral agreements, some regions have advanced market-based reactive power transactions. For example, ERCOT operates a reactive power services market, procuring reactive capacity at critical nodes based on system voltage support requirements (Potomac Economics 2024). Generators, synchronous condensers, and inverters with dynamic reactive power capabilities can all participate in bidding to earn revenue. With the large-scale integration of distributed PV, voltage over-limit issues in distribution grids have become increasingly prominent (Sarah and Paslawski 2023). Some regions are exploring aggregating the reactive power regulation capabilities of distributed resources (such as smart inverters) as an effective supplement to transmission grid voltage support (ERCOT reactive capability testing, 2025).

  • 4. Distributed resource aggregation and virtual power plant market

This innovative participation model uses digital technology and market rules to aggregate vast, dispersed flexible resources into controllable units, enabling them to participate in existing markets at scale as VPPs (Thomas Feenstra 2025; Peter 2019). Germany/EU balancing markets permit aggregators to submit asymmetric regulation capabilities, significantly lowering barriers for distributed resource participation (Loßner et al., 2017); CAISO and PJM have established dedicated demand response aggregator categories with detailed aggregation, communication, and settlement protocols (final et al., 2025); Australia’s EDGE project validated the complete transaction workflow for massive distributed PV and residential storage systems to simultaneously participate in wholesale electricity markets and provide ancillary services through aggregators while meeting distribution network security constraints, providing critical practical evidence for future market rule reforms (Ama van der Sluys, 2022).

3 Inspirations for China’s ancillary service market

Our recommendations are not wholesale transplants. Each is selected to address a specific Chinese institutional feature (e.g., provincial clearing, hybrid compensation) and filtered against foreign-market limitations in Section 2.3 to avoid known problems or add explicit caveats. When multiple alternatives exist, we prefer the one requiring less deviation from China’s current structure, and we state this rationale explicitly for each choice.

China’s electricity market is currently in the early stage of construction, where government regulation and market mechanism coexist. Under this mechanism, in the early stage of market development, the fixed costs and variable costs of power plants and other power companies are compensated by capacity electricity prices and electricity prices, respectively, to ensure basic profitability and recover part of the fixed costs. However, the two-part electricity price mechanism cannot directly participate in market competition, with relatively weak profitability and insufficient flexibility.

3.1 Future development path level inspirations

3.1.1 The general ideas

To support the construction of a new power system with and solve the challenges of randomness and volatility brought by high-proportion new energy, the general idea of developing the ancillary service market in China in the future is to follow the basic principles of ‘system design, step-by-step implementation, easy first and difficult later’ (Chen et al., 2025) and to take market-oriented reform as the core driving force, and to systematically and step-by-step tap and mobilize all available flexible resources by building a modern power market system with wide access, complete variety, fine pricing and sound mechanism, to provide a solid guarantee for the construction of a new power system with clean, low-carbon, safe and abundant, economical and efficient, and supply and demand coordination (IEA 2023).

Future power market reform should start with coherent top-level design to align energy, auxiliary, and capacity markets, then expand pilots’ step by step into a multi-level, flexibility-oriented system. Reforms must remove regional barriers, broaden access, and ensure equal competition among all generation types while fully integrating new flexible resources into ancillary services. Finally, building on spot and auxiliary markets, a capacity market or similar mechanism should be introduced to secure stable returns for reliable, flexible resources and safeguard long-term supply security.

To address China’s lack of new ancillary services like inertia and the reliance on administrative compensation, we propose two measures. First, pilot an inertia or rapid frequency response market in high-renewable regions (e.g., Northwest/North China), adopting Germany’s fixed-price procurement model, designed for early-stage markets with few bidders, to ensure predictable revenue while avoiding illiquid auctions; a transition to competitive procurement should follow once participation grows. Second, incorporate “inertia” and “voltage support” into national grid operation rules, and adopt PJM’s approach of embedding ramping needs into spot market clearing, which internalizes opportunity costs without requiring a separate product and settlement system, a lower-cost first step for China’s consolidating market, though dedicated ramping products remain viable later.

3.1.2 The suggested period objectives

  • Recent market design

In regions without spot-market pilots, reform should prioritize refining large-user direct procurement while preserving system reliability and adequacy. Operating hours of units under direct contracts must be capped to safeguard reserve, frequency, and peak-shaving capabilities, while deviation penalties should be imposed to incentivize accurate forecasting by both generators and consumers. Simultaneously, ancillary-service remuneration frameworks should expand eligibility to include storage, demand-side resources, and third-party providers.

In spot-pilot regions, reform should pursue an integrated market-oriented framework that coordinates energy, ancillary, and retail segments. Medium- and long-term physical contracts must specify daily generation and consumption curves, complemented by day-ahead and real-time spot markets with 15–30-min dispatch intervals. Ancillary services should be competitively tendered day-ahead to procure cost-effective flexible resources across differentiated product lines. In areas with high renewable penetration, piloting inertia or fast-frequency response markets is advisable. Initially, Germany’s regional unified fixed-price procurement model offers a useful benchmark to stabilize investor expectations. On the retail side, time-of-use and dynamic pricing schemes should steer consumer behavior, shifting loads to off-peak periods to better align demand with system conditions.

  • 2. Medium-term market design

Further expand the degree of market competition, gradually reduce and cancel priority power generation and priority purchase of electricity, and promote and improve the spot market. The minimum unit trading period of the day-ahead market becomes half an hour, and the intra-day market is established to provide a flexible resource trading platform for all parties. Based on the spot ancillary service market, the medium and long-term ancillary service market is introduced, and regional black start service capacity markets may be explored for establishment, so that the power system can also guarantee the adequacy of flexible resources on a long-term scale. In the retail market, market-oriented users and electricity sales packages are being increased to improve the optimal allocation level of demand-side flexibility resources.

  • 3. Long-term market design

In the long term, a fully competitive electricity market should be established, and the market mechanism should be fully utilized in the design of all aspects of the market to improve system flexibility. All kinds of planned power and priority power generation are cancelled. In the day-ahead market and real-time market, the full power optimization clearing method is adopted. The trading period is further subdivided into 5–15 min to realize 15-min or even 5-min real-time economic dispatching and improve the optimal allocation level of short-term power resources. The transmission and distribution price mechanism should adopt the peak load responsibility method to improve the utilization of power grid resources and system flexibility. The retail market will be widely promoted in major regions of the country, and the demand side will be fully encouraged to release flexible adjustment resources. And a comprehensive ancillary services market system may be established encompassing multiple dimensions such as frequency, voltage, inertia, and restoration capabilities.

3.2 Technical level inspirations

3.2.1 In-depth evaluation of flexibility resource aggregation features

In new power systems, VPPs aggregate diverse flexible resources but exhibit multi-dimensional coupling. Temporally, storage and EV response delays vary; spatially, grid congestion constrains cross-regional dispatch; cost-wise, marginal costs fluctuate with equipment degradation and fuel prices. Existing clearing models fail to adequately capture these interdependencies, limiting allocative efficiency, necessitating multi-dimensional joint modeling and AI-assisted real-time dynamic evaluation.

Operational uncertainties further intensify these challenges. Boundedly rational user behavior, stochastic state-of-charge (SOC) swings in storage, and intermittent renewable generation often trigger “adverse selection,” whereby declared resource capability diverges from actual deliverability, impairing market-clearing precision and system reliability. Addressing this issue requires integrating uncertainty quantification with adaptive robust optimization, coupled with high-precision short-term prediction to systematically minimize forecasting errors.

3.2.2 Collaborative control of diversified flexible resources

The regulation objectives and response characteristics of diversified heterogeneous flexible resources, such as energy storage, electric vehicles, and controllable loads, are different. For example, the energy storage system is suitable for fast frequency regulation, and the charging of electric vehicles needs to give priority to meeting the travel needs of users. The two may have a competitive relationship in power distribution. If there is no effective coordination mechanism, it will lead to ‘mutually exclusive operation’ of internal resources and reduce the overall service efficiency. Therefore, it is necessary to establish a resource collaborative allocation algorithm based on multi-agent consensus and design a dynamic priority strategy to realize the organic cooperation between resources.

At the level of communication and perception, with many distributed resources connected to the power of the Internet of Things, the problem of insufficient edge computing power is becoming increasingly prominent. At present, due to factors such as the limited computing power of edge nodes and inconsistent communication protocols, the collection of resource status information is delayed, which directly affects the response quality of real-time ancillary services. Therefore, it is necessary to comprehensively improve the edge intelligence level of the power Internet of Things and deploy an end-edge-cloud collaborative computing framework to provide technical support for precise control.

3.3 Market level inspirations

3.3.1 The improvement of the multi-market coordination mechanism

In the current ancillary service markets, frequency regulation and reserve often operate independently from the electricity market, and the rule system lacks an effective connection. This market segmentation phenomenon makes multi-functional resources such as energy storage face ‘role conflict’: participating in frequency modulation services may not be able to carry out peak-valley arbitrage at the same time, resulting in low resource utilization, and even triggering market chaos such as long arbitrage. To solve this dilemma, it is necessary to promote the joint clearing of the electric energy-ancillary service market, design cross-market coupling transaction contracts, and guide the optimal allocation of resources.

For new market entities such as shared energy storage, when they participate in the wholesale, retail, and ancillary service markets at the same time, they face the adaptation problem of different market rule systems. The differences in clearing cycle, pricing mechanism, and settlement rules among different markets have significantly increased operational complexity and compliance costs. This requires the establishment of a unified interoperability framework for market rules, the development of resource optimization decision support systems for multi-market transactions, and the reduction of market participation thresholds.

3.3.2 Improve the reasonable pricing and contribution quantification mechanism

In the pricing of ancillary services, special services such as inertia are faced with the contradiction of value identification. This kind of service not only has the safety value of ‘full-time guarantee’, but also only reflects the economic value when the system inertia is short. The existing pricing mechanism is difficult to balance these two value dimensions, resulting in unstable supplier returns and affecting investment enthusiasm. A dynamic pricing mechanism based on the scarcity of system inertia can be considered, and a two-tier pricing model combining long-term contracts and spot markets can be introduced to stabilize market expectations.

The quantification of the contribution of aggregated resources in virtual power plants also faces technical challenges. Since it is difficult to directly observe the individual contribution when multiple distributed resources jointly provide ancillary services, the existing allocation methods are likely to cause fairness doubts. In this regard, we can study the income distribution model based on cooperative game theory and trace the contribution degree with big data analysis technology to ensure the rationality and transparency of income distribution.

3.3.3 Improve the resource cost recovery mechanism

China’s ancillary service market, characterized by limited product varieties and an immature institutional framework, faces two critical deficiencies in cost recovery for flexible resources.

First, the underdeveloped spot market renders existing products inadequate to meet diversified flexibility demands. This mismatch undermines investment viability for demand-side resources and new energy storage, thereby eroding their regulatory potential.

Second, capacity compensation and pricing mechanisms remain suboptimal. The narrow eligibility scope and fixed compensation under the current two-part tariff prevent flexible resources from capturing scarcity rents during supply shortages, while also failing to convey timely price signals. Moreover, capacity market pilots are restricted to a few provinces and focus narrowly on peak-shaving, lacking multi-temporal variants for frequency regulation, ramping, and inertia. To address these shortcomings, devising appropriate cost-compensation models and establishing a robust long-term capacity market, including progressively diversifying eligible resource types and trading products, is imperative. Such institutional refinement would ensure long-term resource adequacy and substantially enhance overall power system flexibility.

3.3.4 Mitigating market risks and unbalanced funds

The large-scale access to new energy has led to an increase in the price fluctuation of ancillary services and a significant increase in market risk. For example, the Australian market has experienced an extreme situation in which the inertia price fluctuates 8 times within 8 h, bringing huge risk exposure to participants. To this end, it is necessary to improve the price cap and floor mechanism, explore financial hedging tools, and help market players manage possible market risks.

Resource response bias can also lead to the accumulation of unbalanced funds. In some domestic spot pilot projects, the proportion of unbalanced funds has exceeded 5%, which will affect the financial sustainability of the market in the long run. This requires the establishment of a sound deviation assessment mechanism and a balanced account system, and the establishment of a deviation responsibility traceability system based on post-verification to effectively control the size of the funding gap.

3.4 Policy and standard level inspirations

3.4.1 Improve the technology and measuring standard system

At present, technical requirements such as energy storage, security operation and maintenance, virtual power plant aggregation interface, and inertia service have not yet formed a unified standard. There are obvious differences in the response time requirements of energy storage frequency modulation in different regions, which restrict the large-scale application of equipment and the provision of services across regions. It is urgent to promote the unification of technical standards at the national level and establish a standard conformance testing and certification system.

In terms of measurement standards, ancillary services provided by flexible resources need to be accurately quantified. Taking the inertia service as an example, there are many measurement indices, such as kinetic energy (MW·s), moment of inertia (kg·m2), and so on, and there is no unified standard. The consistency of definition and measurement standards should be promoted. Specifically, high-precision phasor measurement units (PMUs)—devices that record voltage and current phasors with GPS-synchronized time stamps at sub-second resolution—should be deployed at key grid nodes and inertia-providing resources (e.g., synchronous condensers, grid-forming storage) to directly observe frequency response speed and the rate of change of frequency (RoCoF) following a disturbance. These measurements would then serve as the technical basis for verifying and settling inertia and fast-frequency-response transactions, replacing indirect, model-based estimates with directly observed performance data, consistent with the frequency-measurement approaches already used in Australia’s and the UK’s inertia and fast frequency response markets discussed above.

3.4.2 Put forward and improve the regional mechanism and policy difference elimination method

The differences in market access and compensation standards among regions hinder the cross-regional optimal allocation of resources. This regional barrier limits the healthy development of the ancillary service market. It is necessary to strengthen the top-level design at the national level and establish a regional coordination mechanism. At the same time, the problem of convergence after the expiration of local subsidy policies is also worthy of attention. We should promote the smooth transition of subsidy policy to a market-oriented mechanism, stabilize the expectation of project investment return, and promote the sustainable development of the industry by establishing a long-term mechanism, such as a capacity electricity price. Having outlined development-path, technical, market, and policy-level inspirations, the final section synthesizes these findings into overarching conclusions and future research directions.

4 Conclusion and prospects

This comparative analysis yields two synthesized insights rather than a simple restatement of case findings. First, the gap between China’s market and mature international systems lies not in the availability of basic services but in the granularity of product design, the precision of pricing incentives, and the efficiency of cross-regional coordination. Second, China’s localized innovations, such as ‘semi-coupled’ clearing, have transitional value, but a longer-term evolution toward joint optimization with energy markets is necessary to minimize total societal costs.

These findings underscore a distinct policy implication: China’s market construction must transition from a phase focused on “coverage” to one dedicated to “refinement and synergy.” A feasible pathway involves leveraging fine-grained product design to unlock the potential of existing flexible resources while establishing cross-regional coordination mechanisms to expand the boundaries of resource optimization. This provides a reform roadmap that integrates international benchmarks with local adaptability.

Looking ahead, future development should explicitly incorporate emerging service markets into a phased implementation plan. In the near term, pilot regions should initiate technical standard research and simulated operation for inertia and fast frequency response markets. By the medium term, exploration should begin for establishing regional black-start service capacity markets. Ultimately, the long-term vision should be the formation of a comprehensive ancillary service market system encompassing frequency, voltage, inertia, and restoration capabilities. Future research should focus on quantitative cost-benefit analyses for emerging services like inertia and ramping to inform precise market design.

Generative AI statement

The author(s) declared that generative AI was not used in the creation of this manuscript.

Any alternative text (alt text) provided alongside figures in this article has been generated by Frontiers with the support of artificial intelligence and reasonable efforts have been made to ensure accuracy, including review by the authors wherever possible. If you identify any issues, please contact us.

Publisher’s note

All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article, or claim that may be made by its manufacturer, is not guaranteed or endorsed by the publisher.

Supplementary material

The Supplementary Material for this article can be found online at: https://www.frontiersin.org/articles/10.3389/fenrg.2026.1773305/full#supplementary-material

Supplementary material Supplementary material at the source

Footnotes

Edited by: Alireza Dehghanisanij, University of Waterloo, Canada

Reviewed by: Hossein Afshar, Islamic Azad University, East Tehran, Iran

Jingrui Liu, Chongqing University, China

Statements

Conflict of interest

Authors WC, ZW, SZ, and JL were employed by Center of Power Grid Planning and Constructing, Yunnan Power Grid Co., Ltd.

The remaining author(s) declared that this work was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.

Funding

The author(s) declared that financial support was received for this work and/or its publication. This work was supported by Management Innovation Project of Yunnan Power Grid Co., Ltd. (0500002024080201GH00007).

Author contributions

WC: Conceptualization, Funding acquisition, Project administration, Supervision, Writing – review and editing. ZW: Investigation, Validation, Writing – original draft. SZ: Conceptualization, Visualization, Writing – review and editing. JL: Conceptualization, Funding acquisition, Writing – original draft. JZ: Conceptualization , Supervision, Visualization, Writing – original draft. XB: Funding acquisition, Project administration, Supervision, Writing – review and editing.

References

  1. Am, a van der Sluys (2022). Project EDGE. Available online at: (Accessed December 16, 2025).
  2. Asia, International Monetary Fund, and Pacific Dept (2023). Market reforms in China’s power sector. IMF Staff Ctry. Rep. (USA) 2023 (081), A004. doi:10.5089/9798400233517.002.A004
  3. Australian Energy Market Operator Ltd (2015). Guide to ancillary services in the national electricity market. Available online at: (Accessed December 13, 2025).
  4. Bi M., Fan Y., Fan H., Sun L., Huang C., Liu Y. (2024). “ Research on multi-level collaborative interactive technology for electricity power balance,” in 2024 IEEE 2nd International Conference on Control, Electronics and Computer Technology (ICCECT), 118 – 122. doi:10.1109/ICCECT60629.2024.10546143
  5. Black Start Strategy and Procurement Methodology 2021/22 (2021). Available online at: (Accessed December 16, 2025).
  6. Carrie X. (2024). “ China’s power market regulation update accomodates energy storage, revises trading rules ”. Energy-Storage. News. Available online at: (Accessed December 16, 2025)
  7. Changxiang R., Liu J., Tan J. (2022). Research on the business model and cost recovery mechanism of new energy storage on source-grid-load side of power system. South. ENERGY Constr. 9 (4), 94 – 102. doi:10.16516/j.gedi.issn2095-8676.2022.04.012
  8. Chao H., Chen X., Jin Z. (2021). “ Reflections on the development of hunan’s frequency modulation auxiliary services market,” in Electrical Equipment and Economy, 75 – 78.
  9. Chen C., Xue B., Cai G., Thomas H., Stückrad S. (2019). “ Comparing the energy transitions in Germany and China: synergies and recommendations.” Energy Rep. 5: 1249 – 1260. doi:10.1016/j.egyr.2019.08.087
  10. Chen Z., Gao S., Jiang Y., Li T., Liu Y., Liu Z. (2025). 2025 China Power Market Outlook: 10 Key Trends for Market Players. Rocky Mountain Institute (RMI). Available online at: (Accessed December 16, 2025).
  11. China Advances Power Market Reform to Support Renewable Integration and System Flexibility - Sino-German Cooperation on Climate Change (2025). Available online at: (Accessed December 14, 2025).
  12. China Energy Storage Alliance (China Energy Storage Alliance) (2021). The National Energy Board solicits opinions on the new version of the ‘two rules’, and the new type of Energy storage is listed as a market entity. Available online at: (Accessed December 16, 2025).
  13. Eid C., Paul C., Perez Y., Reneses J., Hakvoort R. (2016). Managing distributed energy resources in a smart grid environment: a review for incentives, aggregation and market design. Renew. Sustain. Energy Rev. 64 (October), 237 – 247. doi:10.1016/j.rser.2016.06.008
  14. ERCOT Grid Insights: Addressing Issues Important to Maintaining a Reliable and Resilient Grid (2025). Addressing Issues Important to Maintaining a Reliable and Resilient Grid. ERCOT. Available online at: (Accessed December 16, 2025).
  15. ERCOT reactive capability testing (2025). ERCOT reactive capability testing: compliance, CURL, and best practices explained. “ ERCOT Reactive Capability Testing Guide | Keentel Engineering.” Blog. Available online at:.
  16. Feng Y., Lin J., Song F., Ho M. S. (2025). Performance and challenges of power sector reform in China since 2015. iScience 28 (10), 113461. doi:10.1016/j.isci.2025.113461
  17. Fernández-Muñoz D., Pérez-Díaz J. I., Guisández I., Chazarra M., Fernández-Espina Á. (2020). Fast frequency control ancillary services: an international review. Renew. Sustain. Energy Rev. 120 (March), 109662. doi:10.1016/j.rser.2019.109662
  18. Frequency Regulation Compensation in the Organized Wholesale Power Markets, Order (2011). No. 755, FERC, No. 755, Federal Energy Regulatory Commission, FERC, Chapter I, Title 18 of the Code of Federal Regulations Code of Federal Regulations, CFR 137 FERC ¶ 61,06. Available online at: (Accessed December 16, 2025).
  19. Friedlingstein P., O’Sullivan M., Jones M. W., Andrew R. M., Bakker D. C. E., Hauck J. (2026). Global carbon budget 2025. Earth Syst. Sci. Data 18 (5), 3211 – 3288. doi:10.5194/essd-18-3211-2026
  20. Guo H., Davidson M. R., Chen Q., Zhang D., Jiang N., Xia Q. (2020). Power market reform in China: motivations, progress, and recommendations. Energy Policy 145 (October), 111717. doi:10.1016/j.enpol.2020.111717
  21. Hirst E., Kirby B. (1996). “ Costs for electric-power ancillary services.” Electr. J. 9 (10): 26 – 30. doi:10.1016/S1040-6190(96)80153-9
  22. Hogan W. W., Pope S. L. (2019). PJM reserve markets: operating reserve demand curve enhancements. Available online at: March 21 (Accessed December 16, 2025).
  23. Huang L. (2023). “ The current state of China’s electricity market.” Dialogue Earth. Available online at: (Accessed December 14, 2025).
  24. Huang C., Zhou Q., Jia Y., Chen W., Jing Z., Rong Y. (2022). “ Research on European cross-region balancing market settlement method under high proportion of renewable energy.” Energy Rep. 8: 1125 – 1136. doi:10.1016/j.egyr.2022.02.083
  25. IEA (2023). Building a unified national power market system in China – analysis. Available online at: (Accessed December 14, 2025).
  26. IEA (2024). Meeting Power System Flexibility Needs in China by 2030 – Analysis. IEA. Available online at: (Accessed December 14, 2025).
  27. Industry News (2025). From stand-alone to co-location: the future of commercial battery storage. Available online at:.
  28. Inertia Requirements Methodology (2024). Available online at:.
  29. Jenkins M., Cao Y. (2022). China’s ancillary services paradigm shift: market rules adapt to a changing power system. Available online at: (Accessed December 14, 2025).
  30. Jiantao Shi and Wen Zhao (Polaris Power Market Network) (2025). “ Guangdong Power Launches Simulation Trial Operation for Ramp Assistance Service Market.” China Southern Power Grid Newspaper. Available online at: (Accessed December 14, 2025).
  31. Jomaux J. (2025). “The German Afrr Capacity Market - a Deeper Look on Prices.” Substack Newsletter. GEM Energy Analytics. Available online at: (Accessed December 14, 2025).
  32. Li M., Jiao F., Ren C., Zhao R. (2019). China′s power auxiliary service market mechanism and the economics of energy storage systems participating in auxiliary services. South. ENERGY Constr. 6 (3), 132 – 138. doi:10.16516/j.gedi.issn2095-8676.2019.03.022
  33. Lin R., Wetzel D. (2019). IMPLICATIONS OF ENERGY SPOT MARKETS IN CHINA. Rocky Mountain Institute (RMI). Available online at: (Accessed December 14, 2025).
  34. Liu Q., Deng Y., Zhang S., Li G., Dong X., Xie L. (2025). “ Evolution of energy and electricity regulations and development of virtual power plants in German,” in Power Demand Side Management. 27 (05), 118 – 124. doi:10.3969/j.issn.1009-1831.2025.05.018
  35. Loßner M., Böttger D., Bruckner T. (2017). Economic assessment of virtual power plants in the German energy market — a scenario-based and model-supported analysis. Energy Econ. 62 (February), 125 – 138. doi:10.1016/j.eneco.2016.12.008
  36. Monitoring Analytics (2025). 2024 Annual State of the Market Report for PJM. Monitoring Analytics. Available online at: (Accessed December 14, 2025).
  37. Nan S., Guo C., Chen Z., Lu Z. (2025). “ Allocation of ancillary service costs to diverse consumers in China: a comprehensive survey and mechanism design.” Energy Convers. Econ. 6 (3): 141 – 154. doi:10.1049/enc2.70014
  38. National Development and Reform Commission (2024). Energy Bureau: To Establish and Improve the Power Auxiliary Services Market Price Mechanism - Wuxi Goodhao Group. Government Policy. Available online at: (Accessed December 13, 2025).
  39. National Development and Reform Commission (2025). “ Responsible Official from the National Energy Administration Answers Questions from Reporters Regarding the ‘Notice on Issuing the Basic Rules for the Electricity Ancillary Services Market.’” Government Official. Available online at: (Accessed December 14, 2025).
  40. National Energy Administration Central China Regulatory Bureau (2022). “ Chongqing power frequency modulation auxiliary service market operating rules.”. Available online at: (Accessed December 14, 2025).
  41. National Energy Administration Northeast Regional Office (2025). “ Interpretation of the policy: implementation rules for Northeast power mutual aid trading (Trial).” Available online at: (Accessed December 14, 2025).
  42. National Energy System Operator (2020). National Grid ESO Outline New Approach to Stability Services in Significant Step Forwards towards a Zero-Carbon Electricity System |. Available online at: (Accessed December 16, 2025).
  43. National Grid ESO (2023). National Grid ESO Stability Market Design: Final Webinar.
  44. Nemes V. (2021). Inertia Ancillary Service Market Options. MarketWise Solutions Pty Ltd. Available online at: (Accessed December 16, 2025).
  45. Oren S. S. (2001). “ Design of ancillary service markets.” Proceedings of the 34th Annual Hawaii International Conference on System Sciences, 9 doi:10.1109/HICSS.2001.926283
  46. Ott A. L. (2003). Experience with PJM market operation, system design, and implementation. IEEE Trans. Power Syst. 18 (2), 528 – 534. doi:10.1109/TPWRS.2003.810698
  47. Pan Z., Jenkins N., Wu J. (2025). “ Black start from renewable energy resources: review and a case study of Great Britain.” Renew. Sustain. Energy Rev. 209: 115143. doi:10.1016/j.rser.2024.115143
  48. Peter A. (2019). Transforming markets for VPPs in Europe. White paper. Flexibility and trading use cases grow in sophistication and scale. Available online at: (Accessed December 16, 2025)
  49. PJM Interconnection (PJM) (2025). ESAI Power. Available online at: (Accessed December 14, 2025).
  50. PJM Performance Compliance Department (2024). Review of Black Start Formula and Cost Components. October
  51. Poolla B. K., Bolognani S., Li Na, Dörfler F. (2020). A market mechanism for virtual inertia. IEEE Trans. Smart Grid 11 (4), 3570 – 3579. doi:10.1109/TSG.2020.2969518
  52. Potomac Economics (2024). 2023 STATE OF THE MARKET REPORT FOR THE ERCOT ELECTRICITY MARKETS. Potomac Economics.
  53. PW Consulting (2025). “ Frequency Control Ancillary Service Market.” PW Consulting Chemical & Energy Research Center. Available online at: (Accessed December 16, 2025).
  54. Sarah F., Paslawski T. (2023). Distributed Energy Resources (DER) Integration and Compensation Initiative. Summary of Expert Recommendations for Supporting DER Aggregator Participation in Wholesale Markets and Operations in Line with FERC Order 2222. National Association of Regulatory Utility Commissioners (NARUC). Available online at: (Accessed December 16, 2025).
  55. Shu H., Mays J. (2024). Transmission benefits and cost allocation under ambiguity. Available online at: (Accessed December 14, 2025).
  56. SMARD (2020). “ The balancing energy market has started ”. Available online at: (Accessed December 14, 2025).
  57. Thomas Feenstra (2025). Guide to virtual power plants (VPP) | Helin. Available online at: (Accessed December 16, 2025).
  58. Tingting Y., Li X., Zou B., Gu S. (2023). Market analysis of an ancillary service to promote flexible resources. Power Syst. Prot. Control 51 (07), 73 – 83. doi:10.19783/j.cnki.pspc.220896
  59. Ulbig A., Borsche T. S., Andersson G. (2014). “ Impact of low rotational inertia on power system stability and operation.” IFAC Proc. Vol. 47 (3): 7290 – 7297. doi:10.3182/20140824-6-ZA-1003.02615
  60. Wang J., Ma H., Wang Bo, Xiaozhu L. I., Lidong Q. I. N., Wang G. (2023). Analysis on the coupling between the auxiliary service market and multiple types of markets for integrated energy systems. Integr. Intell. Energy 45 (10), 82. doi:10.3969/j.issn.2097-0706.2023.10.010
  61. Wang W., Wang X., Wang H. (2025). A novel business model and charging and discharging pricing strategy for centralized energy storage service providers to enhance local photovoltaic consumption. Electr. Eng. 107 (10), 13755 – 13773. doi:10.1007/s00202-025-03233-1
  62. Wei H., Zhang N., Du E., Jiang H., Zhuo Z., Davidson M. R. (2025). Emerging demand-side flexible resources accelerate China’s power system transition toward carbon neutrality. iScience 28 (5), 112372. doi:10.1016/j.isci.2025.112372
  63. Wu Shan B. X., Zhang J., Lin Yi, Lin W. (2023). A review of domestic and foreign ancillary services market for improving flexibility of new power system. Trans. China Electrotech. Soc. 38 (6), 1662 – 1677. doi:10.19595/j.cnki.1000-6753.tces.211730
  64. Xinhua (2025). Renewable energy accounts for 56 pct of China’s total installed capacity. Available online at: (Accessed December 13, 2025).
  65. Xu Y., Hu J., Shen T., Wang C., Tian J., Jia F. (2022). Optimization model and settlement mechanism of electricity market in Zhejiang Province under the form of diversified and highly resilient grid. BCP Bus. & Manag. 25 (August), 41 – 48. doi:10.54691/bcpbm.v25i.1693
  66. Xu L., Feng K., Lin N., Perera A., Poor H. V., Xie L. (2024). Resilience of renewable power systems under climate risks. Nat. Rev. Electr. Eng. 1 (1), 53 – 66. doi:10.1038/s44287-023-00003-8
  67. Yongsheng F. (2023). Research on China’s Electricity Sectore Reforms Theories and Polices. 1st ed. Social Sciences Academic Press. Available online at: (Accessed December 14, 2025).
  68. Zdunkewicz R. (2025). “ Virtual power plants in action: How rules and markets enable (or block) aggregation ”. Pv Magazine USA. Available online at: (Accessed December 16, 2025).
  69. Zou P., Cui X., He X., Jin Z., Zhang C., Cheng X. (2024). “ Design and practice of power reserve ancillary service market mechanism of Shanxi in China,” in Power System Technology 48 (06), 2490 – 2501. doi:10.13335/j.1000-3673.pst.2023.2284

Citation

Chen, W., et al. (2026). The comparison analysis of ancillary service market in new power system: policies, practices and inspirations for China. Frontiers in Energy Research, Volume 14. https://doi.org/
Received
Accepted
Published
Volume
14 - 2026

Copyright

Copyright © 2026 Chen, Wang, Zhao, Liu, Zhang and Bian.

License: https://creativecommons.org/licenses/by/4.0/

*Correspondence: Jiawei Zhang

Article metrics

Views
0
Downloads
0
Citations
0
Shares
0